Apply for an Electricity Connection -

 

Requirements for Service

  1. 1. A copy of Municipal rates account for the property
  2. 2. Copy of ID of property owner

List of Steps

  1. 1.1 Download Application Form Here(Residential)
  2. 1.2 Download Application Form Here (Non Residential)
    or Apply Online on E-Portal

    ‎‎
  3. 2 Contractors are requested to use the online forms attached and e-mail (upload) it back after completing it with their clients. ‎
  4. 3. Submit completed application form with site plan online (upload)‎ ‎
  5. 4. Receive Tax Invoice via email
  6. 5. Payment (cash/EFT) ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎ ‎
  7. 6. Send proof of payment (email)

Instructions

Submit site plan and layout drawings indicating main distribution board location on site and supply size required at the Electricity Department, Engineering Services. City of Windhoek is licensed to distribute electricity in the Municipal area. If you are in a City-supplied area and want to apply for an electricity connection, please see the process outlined above. An application for “Supply of Electricity” will be completed on your behalf by your electrical contractor. (The application form must be signed by both the client and the electrical contractor of your choice).

 

* Only applications received from an approved City of Windhoek Electrical Contractor will be processed. (Download list of approved Electrical Contractors).

Contact Number

Number

061 290 3777

Email Address

Email

enquiry@windhoekcc.org.na